Vancouver Landfill, Phase 3, West Closure Gas System Upgrades


This project consisted of the supply and installation of a geo-membrane closure system (5.5 Ha area), gas extraction well drilling, excavation, grading, construction of a leachate and gas collection system, gas system upgrades, a 4 Ha double-lined surface water detention pond and erosion and sediment control measure. All work was substantially complete within a short time of 3.5 months.