Mill House


This 15,000 m3 excavation and shoring project was completed for Marcon Construction in 2015. Though the site proved difficult, Hall was able to work with the Owner to deliver the excavation on time. Extra measures were taken to ensure that the neighboring creek was protected and that silt from the excavation was diverted away from the waterway. Hall also used it's ocean dumping facility to provide the most economic soil disposal option on this project.