Carnarvon


Hall Constructors was contracted by Metro-Can Construction to complete this 25,000 m3 excavation & shoring project. The bottom half of the excavation proved difficult as significant groundwater was discovered as digging progressed. Conventional pumping could not keep up to the water in the sandy ground, and Hall worked with the Owner to install a dewatering system to lower the local water table. In the end, Hall wrapped up another successful project by craning their excavator out of the excavation.