25 Main


This property at Main St and King Edward Ave in Vancouver was previously occupied by a gas station resulting in widespread gasoline contamination in the site soil. Although the majority of the soil within the property was removed as part of the initial remediation process by others, Hall identified and removed remaining soil that had contamination levels exceeding acceptable standards. The remaining 3,500 m3 of material was used to build ramps and pads to complete the pile driving and shotcrete shoring. Upon completion of the shoring, all excess material was hauled off site and detail excavation was completed for the foundation of this mixed-use residential development.